Beam and culvert launching

Construction Engineering



SICET Launching Truss

The SICET Launching Truss is a self-propelled machine for launching precast beams into their final position.

This operation is performed for maximum spans of 45m and beams weighing up to 120t. It also applies to curved sections with a maximum radius of 400m and maximum ramp gradients of up to 5%.

Together with the Carrelone and Fischietti auxiliary equipment, this forms a complete set for launching the beams.

SICET ROHR Trelic
SICET Launching Truss

Applications

Benefits
  • It enables the construction of large spans for bridges and viaducts using precast beams, eliminating the need for shoring and on-site formwork for each span of the structure;
  • It allows for the construction of foundations, pillars, and crossbeams while, simultaneously, the precast beams are being poured into concrete.
  • It reduces the time and costs of building bridges and viaducts.
Features

Mod. 100/40

  • Load capacity for beams up to 100 t
  • Maximum launch span 40 m
  • Maximum operating ramp 5%

Mod. 120/45

  • Load capacity for beams up to 120 t
  • Maximum launch span 45 m
  • Maximum operating ramp 5%

Each project has its own specific launch characteristics. Request a quote from our technical department, which will assist you in finding the best solution for your project.

Artworks





Related products






Receive our exclusive content.

New products, market information, and projects carried out by ROHR.

Copyright © 2026 ROHR Tubular Structures - All rights reserved. Website by: plyn!